Coal Buring Waste Gas Heat Recovery Project
Author:sehenstar Source:本站 Pubtime:2018-01-22 16:35:46 Click:589
Customer Request
1. Working Condition: Coal burning flue gas heat recovery
- 10t boiler with flue gas flow rate 20000~3000m³/h
- Temperature from 210℃ to 150℃-160℃
- Induced draft fan to blow air under 210℃
- Cooling medium: air
- 15KW blower flow rate 12000m³/h
2. Material: Ss304
Sehenstar Proposal
1. Type of Heat Exchanger: Flue gas heat exchanger2. Drawing: