Biodiesel Boiler Flue Gas Cooling
Author:sehenstar Source:本站 Pubtime:2017-11-17 09:31:37 Click:586
Customer Request
1. Working Condition: Biodiesel boiler flue gas cooling
- Biodiesel boiler running 24 hours
- Flue gas highest temperature 190℃, with dust
- Needs to consider easy cleaning
- Flue gas flow rate 23000m3/h
- Water heat to 85-95℃ and back to boiler to fill water
- A closed cycle water tank is needed at the water side
- Tank size according to calculation
2. Material: Ss304
Sehenstar Proposal
1. Type of Heat Exchanger: Flue gas Heat Exchanger
2. Drawing: